Te Oro (Glen Innes Music and Arts Centre)

Project: Development of the Glen Innes Music and Arts Centre  
Client: Symonite
Date:
June 2014
Role: Façade Engineering
About the project: Two different aluminium panels were used: Tray panel and fixed cassette.  Trusses were used to support the panels which allowed for the curved look of the building.

Te Oro has already won a number of awards for its' design and it is once again a finalist in this years Designers Institutes Best Design Award.